Project Description:
The project will replace and reconstruct nearly three miles of the existing sewer force main system consisting of two parallel 36-inch diameter sewer pipelines on Westminster Boulevard between Seal Beach Boulevard and Rancho Road/Hammon Place in the cities of Seal Beach and Westminster.
A force main system are pipes used to move wastewater under pressure by use of a pump station. Force mains are necessary when gravity flow is not sufficient to move wastewater.
This project is within the Western regional service area.