OC San's Treatment Plant No. 2 is located in Huntington Beach adjacent to the Santa Ana River and across the street from Huntington State Beach.
The Neighborhood Connection Newsletter is now the OC San Connection Community Newsletter, focused on content regarding OC San programs, construction projects, fun facts, and so much more.
FUTURE CONSTRUCTION PROJECT
HUNTINGTON BEACH (INCLUDES PLANT NO. 2)
- Perimeter Wall Improvements (2024)
- Digesters Rehabilitation (2025)
- Activated Sludge Aeration Basin Rehabilitation (2027)
- Digester Gas Facilities Replacement (2027)
- TPAD Digester Complex (2027)
Project Description: This project will replace the perimeter chain link fence along the Talbert Marsh with a concrete wall. The top of the wall will have a wave-like pattern ranging between 8-feet to 10-feet tall.
Construction is anticipated to begin 2024 and take approximately 2 years to complete.
In preparation of the upcoming construction, existing vegetation and trees will be trimmed and cut down outside the bird nesting season, anticipated to occur between September – December 2023. (Click on project name above for more information.)
Digesters Rehabilitation at Plant No. 2
Project Description: This project will rehabilitate existing Plant No. 2 digesters including repairing the digester domes, walls, and bridges, rehabilitating the hot water piping system, improving miscellaneous safety related items, and replacing electrical motor control centers that are obsolete.
Construction is anticipated to begin 2025 and take approximately 2 years to complete.
Activated Sludge Aeration Basin Rehabilitation at Plant No. 2
Project Description: This project includes structural rehabilitation of the aeration basin’s reactor deck and adjacent concrete structures, coating the interior of reactor tanks to mitigate exposed concrete aggregate, replacement of all mechanical equipment, components, and piping, including all gates, valves, and appurtenances.
Construction is anticipated to begin 2027 and take approximately 3 years to complete.
Digester Gas Facilities Replacement
Project Description: This project will replace the low- and high-pressure digester gas facilities at Plant Nos. 1 and 2 to meet current and future needs such as projected gas production and Air Quality Management District and National Fire Protection Association regulations.
Construction is anticipated to being 2027 and take approximately 5 years to complete.
TPAD Digester Complex
Project Description: This project is the largest of a set of related projects to replace the mesophilic anaerobic digesters at Plant No. 2 with new digesters in a temperature-phased anaerobic digester (TPAD) configuration. This project will include new thermophilic digesters, batch tanks, cooling facilities, and associated sludge pumping, digester mixing, power distribution, and controls.
Construction is anticipated to begin 2027 and take approximately 7 years to complete.